Cost-effective PEB Steel Workshop Building Engineering
video
Cost-effective PEB Steel Workshop Building Engineering

Cost-effective PEB Steel Workshop Building Engineering

PEB steel structure building is a new type of light steel structure building system, which refers to the building structure constructed by welding, bolted or assembly with steel as the main structural material.

  • Fast Delievery
  • Quality Assurance
  • 24/7 Customer Service
Product Introduction
Product Introduction


PEB, which stands for Pre Engineered Buildings. PEB steel structure building refers to the building structure constructed by welding, bolted or assembly with steel as the main structural material.

Steel structure workshop is a building with load-bearing structure composed of building steel. Beams, columns, trusses and other components, usually made of section steel and steel plates, constitute load-bearing structures. Together with the roof, floor and wall enclosures, it forms a complete steel structure workshop.


Product Specification

 

Brand nameXGZ
Place of OriginQingdao, China
Frame gradeQ355/Q235B/ASTM ETC.
Surface treatmentPaint/Hot dip galvanization
Products

Steel frame/crane/roof and wall panel/insulation/ window/door/skylight/ventilation/ceiling/solar panel/

Louver/Mezzanine/curtain wall ETC. and Customized products

Delivery time20-60 days after shop drawing confirmed
Guarantee period5 years
Service life50 years
MOQ1,000 square meter

 

Our Certifications

 

Guided by the national "the Belt and Road" strategy, the company actively explores international development facing the global market, and has obtained CE certification, IS09001 quality management system certification, IS014001 environmental management system certification, and ISO45001 occupational health and safety management system certification.


8

9

10


Packaging & Shipping


1. Steel components are packaged with iron pallets at the factory with the coding number, which is convenient for customers to unload.

2. Small steel structures are tied with iron wire and labeled.

3. Steel columns, beam ends and plates are wrapped in blankets to prevent collisions with containers during transportation.

4. Fasteners are packed in wooden cases.

5. The color coated roof and the upper layer of the wallboard are covered with plastic film, and the maintenance edge is wrapped with plastic film and labeled.

6. All siding and roof panels will be laminated on both sides and securely secured in the container.

7. Protect doors and Windows with foam paper and secure them in containers.

8. Container type :40ft HC, 40ft OT, 20ft GP.

9. Mode of transport: sea, air, inland river transport.

10. Maintain good relations with a number of shipowners to ensure smooth transportation.


Construction Process

 

The construction process of steel structure workshop includes design, production, transportation and installation.

· Design phase. Preliminary design is required according to the use and requirements of the workshop.

· In the production stage, materials need to be purchased and components prefabricated according to the design drawings.

· Transport phase. Usually, the mode of transport can be chosen by land or water transport.

· During the construction phase, the embedded parts should be installed according to the design drawings first. The steel structure members are then installed one by one.

· Finishing work. Carry out the construction of roof and wall, including waterproof, heat preservation, decoration, etc.

· Finally, inspect and accept the whole workshop to ensure that the construction quality meets the requirements.

 

 


You Might Also Like

(0/10)

clearall